Wellcome to National Portal
মেনু নির্বাচন করুন
Main Comtent Skiped

Project List

Search

# Project Name Start End Word Project Type Amount Latest Status Progress
1 Adashan Anwar Master's House Road Brick Soling Karon 01-10-2023 23-11-2023 01 kabita 80000/= 12-08-2024 বাস্তবায়িত
2 No. 04 Char Shidhalkura from Zaman Bepari's house to South Char Shidhalkura Govt Primary School road brick lining. 19-05-2023 30-05-2023 ০৪ Others 250700 30-05-2023 বাস্তবায়িত
3 No. 07 Construction of wooden pool at the Ghata of Chhota Shidhalkura Hafez Ayazuddin Master's house. 21-05-2023 30-05-2023 ০৭ Others 100000 30-05-2023 বাস্তবায়িত
4 Installation of deep tube well in the house of Masum Hawladar 01-12-2023 08-03-2024 03 adb 12-08-2024 বাস্তবায়িত
5 Both side sleeves of paved bridge of talukdar house and soil filling on both sides. 07-12-2023 09-05-2024 03 kabita 294365/= 12-08-2024 বাস্তবায়িত
6 A deep tube well was installed at the house of Khalek Bepari, Md. of Bara Shidhalkura Ward No. 05. 01-12-2023 10-01-2024 05 adb 100000 12-08-2024 বাস্তবায়িত
7 Repair the road from Digshul Ward No. 09 Ismail Dewan's house to Bablu Sardar's house. 05-03-2024 18-04-2024 09 kabita 85000/= 12-08-2024 বাস্তবায়িত
8 Installation of deep tube well at the house of Md. Osman Khan, father Md. Abul Khan of Char Shidhalkura Ward No. 03 02-05-2024 15-05-2024 03 adb 100000 12-08-2024 বাস্তবায়িত
9 Char Shidhalkura from Ward No. 04 main road to Majid Bepari's house, brick paving. 06-03-2024 24-05-2024 03 kabita 200000/= 12-08-2024 বাস্তবায়িত
10 Chhota Shidhalkura 07 Ward No. Razzak Khan's house to Khan Bari Jame Masjid constructed dirt road. 05-03-2024 08-05-2024 07 kabita 80000/= 12-08-2024 বাস্তবায়িত
11 Brick saling from Pakarasta of Abul Matbar to Taltala Ghat. 14-12-2023 15-05-2024 08 kabita 200000/= 12-08-2024 বাস্তবায়িত
12 Chhota Shidhalkura 07 Ward No. Razzak Khan's house to Than Bari Jame Masjid constructed dirt road. 03-01-2024 20-03-2024 07 adb 81000/= 12-08-2024 বাস্তবায়িত
13 Bara Shidhalkura Ward No. 08 from the house of Veer Mukti Joddha Eskander to the main road. 13-12-2023 06-03-2024 08 kabita 80000/= 12-08-2024 বাস্তবায়িত
14 Brick paving of the road from Gazi Bari Main Road to A: Rahman Fakir's house. 01-02-2024 28-02-2024 06 adb 279080/= 12-08-2024 বাস্তবায়িত
15 Reconstruction of Alamgir Sardar's house main road from Ward No. 05 Bara Shidhalkura DC Road. 02-01-2024 15-02-2024 05 tr 100000 12-08-2024 বাস্তবায়িত
16 Road brick paving from Adashan 02 Ward Main Road to Latif Master's house. 02-12-2023 15-02-2024 02 Others 160000/= 12-08-2024 বাস্তবায়িত
17 Construction of wooden pool in front of Sabuj Sardar's house 01-09-2023 25-10-2023 ০১ tr 200000/= 12-08-2024 বাস্তবায়িত
18 Adashan Ward No. 02 Reconstruct the road to Billal Howladar's home from the house of late Farid Sardar. 12-12-2023 13-03-2024 02 kabita 80000/= 12-08-2024 বাস্তবায়িত
19 Adashan 01 Ward No. Reconstruction of wooden pool in the Ghata of Rob Sikdar's house. 06-03-2024 20-04-2024 01 tr 100000 12-08-2024 বাস্তবায়িত
20 03 Ward Char Shidhalkura Latif Khan's house pond from north bank to south bank. 01-01-2024 10-04-2024 03 adb 243000/= 12-08-2024 বাস্তবায়িত